39. Tunnel Vision
Aired Oct 23, 202345 min
The nation-building project that went horribly wrong. Snowy Hydro 2.0 was sold as a low-carbon future by the end of 2024. Instead, the pumped hydro project is now five years behind schedule and forecast to hit $12 billion.
Your diary entry
Sign in to log when you watched this episode, add your rating, and write a review.
Sign in →