8. The Wayland House - 8
Aired Oct 24, 1991
Our master carpenter completes the radius frame for the front portico deck, while our general contractor reviews the new engineered wood framing for the kitchen and master bath. Excavator Herb Brockert begins digging the leaching field for the new septic system. Asbestos is removed from pipes in the basement.
Your diary entry
Sign in to log when you watched this episode, add your rating, and write a review.
Sign in →