14. Arlington 2014: Part 6: Additional Details
Aired Feb 8, 2014
The new kitchen windows are inspected. Cast iron waste pipes are installed with a traditional lead and oakum joint. Outside -- trim is replicated and new siding is installed.
Your diary entry
Sign in to log when you watched this episode, add your rating, and write a review.
Sign in →