14. Lexington Project 2015: Part 6: Exterior Details
Aired Feb 7, 2015
A look at the mudroom door; the work required to patch in new clapboard; the back deck's hybrid railing system; and the layout and design choices for the kitchen. Also: what goes into a rough electrical inspection; and what's trending in kitchens.
Your diary entry
Sign in to log when you watched this episode, add your rating, and write a review.
Sign in →