BingeBoxBingeBox

15. Lexington Project 2015: Part 7: Inspections

Aired Feb 14, 2015

Rough mechanical and rough framing inspections are discussed; reinforced fiberglass columns to support the farmer's porch are installed; how an arched doorway is being turned into one that's squared off; and the storm window system being using to enclose the screen porch is spotlighted.

Your diary entry

Sign in to log when you watched this episode, add your rating, and write a review.

Sign in →
Lexington Project 2015: Part 7: Inspections