BingeBoxBingeBox

16. Lexington Project 2015: Part 8: Conservation Concerns

Aired Feb 21, 2015

A covered gutter is installed; the infiltration system to disperse water from gutters into the ground is detailed; native plants that will return part of the lawn back to nature are discussed; and how existing aluminum wiring is being worked with while updating recessed light fixtures and installing sconces over the mantel. Also: the making and testing of two types of windows for the project.

Your diary entry

Sign in to log when you watched this episode, add your rating, and write a review.

Sign in →