7. Charlestown 2014: Part 7: Rowhouse, Lighthouse
Aired Nov 15, 201426 min
A basement door is concealed; the new Cararra marble island top is spotlighted; a PVC fence is installed on top of the retaining wall; the front steps are given new life with a grinder, a router, epoxy and non-slip exterior paint; and the salvaged marble mantel and surround are installed in the sitting room. Also: the transformation of a Boston lighthouses into a summer home.
Your diary entry
Sign in to log when you watched this episode, add your rating, and write a review.
Sign in →