BingeBoxBingeBox

17. Ipswich: Prep-Work

Aired Apr 6, 2023

Preparation for the new foundation begins. A centuries old cistern is uncovered. The original timber frame structure is assessed, and the original floorboards and roof sheathing are salvaged for later use. The sill is inspected for water damage.

Your diary entry

Sign in to log when you watched this episode, add your rating, and write a review.

Sign in →