19. Ipswich: Below Grade Plumbing

Aired Apr 20, 2023

The old fireplace firebox is demolished leaving the chimney for the new fireplace. The dismantled timber frame pieces are restored offsite. Plumbing is run for a below grade bathroom. A steel beam is prepared for installation. Kevin goes clamming.

Your diary entry

Sign in to log when you watched this episode, add your rating, and write a review.

Sign in →