16. The Reading Ranch - 8
Aired Jan 23, 1986
Tile work is done in the master bath of the new addition, and new fixtures are installed. With work nearing completion, our master carpenter builds a staircase to the new second floor.
Your diary entry
Sign in to log when you watched this episode, add your rating, and write a review.
Sign in →